Stream-flow gaging station on lower east branch (E2) of Mill Creek showing stage instrumentation:  (A) instrument housing in standard mailbox with high-stage staff gage, (B) data logger with cable to PC,  (C) stilling well with staff gage on outside and sensor (pressure transducer) inside connected by wire through PVC pipe to data logger, (D) second staff gage.